Agilent Technologies E8267C PSG Manual de usuario Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
14
Verify Proper Installation of Option 602
1. Turn the signal generator on.
2. Check that Option 602 is installed by pressing
Utility > Instrument Info/Help Mode > Options Info.
3. Perform the “Checking Signal Generator Functionality” procedure, as described on page 5.
4. Verify that the Baseband Generator self-tests all pass.
Re-Assemble the Signal Generator
Refer to Figure 1.
1. Reinstall the inner and outer instrument covers by reversing the order for removal.
2. Torque all T-10 screws to 9 in-lbs.
3. Torque all T-15 and T-20 screws to 21 in-lbs.
4. Attach the Option 602 label to the rear panel, near the original serial number label.
5. Attach the Digital Bus label over “DIG I/Q I/O” on the rear panel.
Run the I/Q Calibration
1. Turn the instrument on and let it warm up for 30 minutes.
2. Press:
I/Q > I/Q Calibration > Calibration Type Full > Execute Cal
Verify Instrument Calibration
The new baseband generator will function properly in most applications, without re-calibrating the signal
generator. If the application is critical, with respect to EVM, the following performance tests are
recommended. Refer to the PSG Signal Generators Service Guide:
1. Self Test
2. I/Q 20 Prelevel Gain Mixer Bias, and Digital Gain Cal
3. I/Q Impairment Calibration
4. EVM and IQ Offset
5. External Digital Modulation Level Accuracy Relative to CW
6. Dual Arbitrary Waveform Generator Check
Vista de pagina 13
1 2 ... 9 10 11 12 13 14

Comentarios a estos manuales

Sin comentarios