Agilent Technologies E6640A EXM Manual de servicio Pagina 158

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 340
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 157
158 Chapter 11
Example Test Scenarios
Verification Example
Example Test Scenarios
Most of the five remaining channels can be left as they are. However, DPCH requires two changes.
Under Channel Setup, we change the Spreading Code to 9 (as that is the default code for this DUT). We
also change the TPC pattern to “All Up”. This means that the Transmit Power Control commands, which
the waveform will include in each timeslot, will instruct the DUT to set the uplink signal it transmits to
maximum power. (Later we will create an alternative version of the waveform, which uses a different
TPC pattern.)
Figure 11-11. Configuring DPCH
Under Waveform Setup, we change the name of the waveform to “All_Up”.
Figure 11-12. Naming the Waveform “All_Up”
Vista de pagina 157
1 2 ... 153 154 155 156 157 158 159 160 161 162 163 ... 339 340

Comentarios a estos manuales

Sin comentarios