Agilent Technologies DisplayPort Manual de usuario Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 56
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
Agilent Technologies, Inc.
DisplayPort Test Implementation Group 10 Agilent J-BERT N4903B & 90000A/X/Q Series Sink Draft2
NA
168mUI
46mV
diff
+/-10%
150mV
diff
+/-10%
33 KHz, triangular shaped, 5000 ppm down spread
No
No
D24.3 (quarter rate
Clock)
405MHz Clock
D24.3 (quarter rate
Clock)
675MHz Clock
134mV
diff
applied at
TP3
450mV
diff
applied at
TP3
No
Yes
Refer to Table 4-1 of the CTS
Figure 1: Table of Stressed Eye Test Conditions
9 Sink Test Calibration Procedure
The following Figure shows the conceptual setup as described in Figure 4-3 of the PHYCTS 1.2b.
Figure 2: PHY CTS 1.2b HBR/HBR2 Conceptual Setup (Figure 4-3 in PHY CTS 1.2b)
The following procedure describes step-by-step how to calibrate the stressed impairments per the PHY
CTS 1.2b. Follow the steps appropriate for HBR2, HBR, and RBR. The detailed example shown is for
HBR2 as specified in Table 4-4 of the PHYCTS 1.2b. Since the lanes on test fixture vary in ISI and cross
talk behavior the calibration steps for ISI, SJ
sweep
and eye opening without and with cross talk have to be
done per lane.
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 55 56

Comentarios a estos manuales

Sin comentarios