© Agilent Technologies2000–2003 Agilent 3070 / 79000 DUT Power Supply Installation 78
Completing the Installation
Verifying Operation
1 Look at the Testhead Config screen and verify that the
official configuration agrees with the actual
configuration.
2 Run Diagnostics, especially the DUT power supply
tests with a pin verification fixture.
NOTE
If Diagnostics fails, verify that there are no
shorting straps on the terminals. Some supplies
come from the factory with shorting straps. They
must be removed to do remote sensing.
In Case of Difficulty
Contact Agilent’s Customer Support Center. Go to the
Agilent Automated Test Equipment Contacts website
and select your country:
www.agilent.com/see/contact_info
Replacing the Covers
After verifying that the newly-installed power supply
functions properly, replace all covers on the support bay
and testhead.
Installation Billing Information
Up to two hours of installation time can be charged
(time and materials) to Agilent’s Manufacturing Test
Business Unit (MTBU) for installing a DUT power
supply if the installation was performed by a
service-trained and qualified Agilent-authorized service
representative.