Agilent Technologies ENA Series Guía de usuario Pagina 216

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 775
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 215
210 Chapter 4
Calibration
Power Calibration
Preparing to control the power meter
When acquiring power calibration data, the power meter is controlled via GPIB from the
E5070B/E5071B.
To control the power meter from the E5070B/E5071B, connect the USB port of the
E5070B/E5071B and the GPIB connector of the power meter through the USB/GPIB
interface as shown in Figure 4-61 and set the GPIB address of the connected power meter
with the E5070B/E5071B.
NOTE The USB/GPIB interface must be ready to use. For more information, see “Setting the
GPIB” on page 428.
Setting GPIB address of the power meter
Use the following procedure to set the GPIB address of the power meter:
Step 1. Press .
Step 2. Press
Misc Setup.
Step 3. Press
GPIB Setup.
Step 4. Press
Power Meter Address.
Step 5. Enter the GPIB address of the power meter you are using.
Figure 4-61 Connection between power meter and E5070B/E5071B
Vista de pagina 215
1 2 ... 211 212 213 214 215 216 217 218 219 220 221 ... 774 775

Comentarios a estos manuales

Sin comentarios